Expertise · Strategic industrial projects

Plant relocation and CAPEX projects: steered from studies to delivery

Plant relocation and CAPEX project management: plant and line transfers, greenfield sites, tenders, start-up and ramp-up, steered on the manufacturer's side, from studies through to delivery.

Structuring and steering complex industrial transformations

A site transfer, a new plant or a CAPEX project affects the production base for months. Each stage involves its own parties, and the risk sits in the interfaces between them.

The approach balances advice and execution: whoever makes the recommendation stays to implement it, with no handover and no junior team between the shop floor and you.

See the reference: transferring two sites into a new-build plant

Discuss your project

Services

What plant relocation and CAPEX project management covers

01

Site and line transfers

Moving a line or consolidating sites without letting customers down: equipment inventory, transfer sequence, buffer stock, restart.

02

Greenfield sites, relocation

Turning an industrial need into a brief — capacity, flows, floor space, utilities, regulatory constraints — that then underpins studies, tenders and budget.

03

CAPEX projects and trade-offs

Linking each investment to its expected effect on capacity, quality or cost, then trading off scope, budget and schedule when they pull against each other.

04

Master schedule, budget, risk

A master schedule linking studies, permits, packages, machinery and start-up; a budget tracked by package; risks identified early, each with an owner.

05

Tenders, bid analysis, negotiation

Specifications, invitations to tender, like-for-like bid comparison, negotiation, then follow-up of the commitments made.

06

Start-up preparation and ramp-up

Trials, qualification, training and first indicators prepared before the works end, then ramp-up tracked until the target rate is reached.

Role

Steering the project on the manufacturer's side


The manufacturer holds the need, the budget and the decisions; the design team (maîtrise d'œuvre) designs the project and supervises the works; contractors deliver the packages.

On the transfer of two sites into a new-build plant, DOPEX leads the technical side of the project, from studies to delivery.

The reference in detail
  • Design team

    Supervising studies and works

    Reporting progress, deviations and open points in good time.

  • Packages

    Coordinating technical packages

    Interfaces between contractors, sequence of work, acceptance.

  • Management

    Preparing trade-offs

    Setting out options, costs and risks for decision.

The stages of a plant or line relocation

A site or line transfer generally runs through six stages, which overlap: tenders often start before the studies are finished.

  • Scoping and continuity requirements: what must keep shipping during the transfer, to which customers, at what service level; scope, target budget, timing.
  • Studies and permits: layout, flows, building, utilities; required permits identified as early as possible, since their lead times often weigh on the schedule.
  • Tenders and packages: splitting the work into packages, specifications, invitations to tender, contracts.
  • Machinery and utilities schedule: for each piece of equipment, shutdown, adaptation, move and restart, timed to the utilities; buffer stock built before each shutdown.
  • Start-up preparation: trials, process and product qualification, team training, first indicators.
  • Ramp-up: output, quality and losses tracked closely until the target rate is reached, then steering handed back to the site teams.

How long each stage takes depends on the scope, the permits required and equipment lead times.

Tenders and negotiation of technical packages

A tender is prepared before it is issued: precise specifications, packages in line with the schedule, real competition. Then comes the analysis:

  • compare bids like for like: scope, exclusions, options, lead times, terms;
  • test each bid against the initial estimate, line by line;
  • negotiate content as much as price: technical alternatives, phasing, how the work will be carried out.

DOPEX Conseil assignment · transferring two sites into a new-build plant. −30 to −40% optimisation achieved on the EIA & HVAC bids. The optimisation figures relate to the packages concerned, measured against initial estimates — not to the overall project budget.

Preparing start-up and ramp-up

Start-up is prepared before the works end. Four things need to be worked on in advance:

  • acceptance and qualification criteria set in advance;
  • teams trained before the first production run, on the new equipment and standards;
  • a realistic ramp-up curve, with capacity, quality and yield milestones;
  • close control of the first weeks: stoppages, scrap, causes, actions.

Once the target rate is reached, stabilising it is an operational excellence matter: OEE measured, losses quantified, management routines in place.

Stabilising OEE after start-up

DOPEX Conseil assignment

Reference: transferring two industrial sites into a new-build plant

DOPEX Conseil assignment · Geosynthetics · France & Austria

Moving the activities of two sites in France and Austria into a new French plant, with no break in industrial continuity. DOPEX leads the technical side of the project, from studies to delivery: environmental permit and public enquiry alongside an environmental consultancy, supervision of the design and works management, coordination of technical packages, tenders and negotiations, machine purchase and adaptation schedule, weekly and bi-monthly steering routines.

Scope: 2 sites · 2 countries · new-build plant · environmental regulation · utilities · machinery · industrial continuity.

The two-site transfer in the case studies
2 sites / 2 countries
France & Austria → new plant in France
≈ €25m
of technical and construction packages coordinated
≈ €8.5m
of industrial equipment managed
−30 to −40%
optimisation achieved on the EIA & HVAC bids

The optimisation figures relate to the packages concerned, measured against initial estimates — not to the overall project budget.

Governance

Project governance and resources

One point of contact. A collective when the scope calls for it.

Cadence

Steering routines

Progress, budget, risks and decisions reviewed at fixed intervals.

Mid-caps & groups

Project-grade capability

Multi-site governance, work package coordination, interfaces with the design team, procurement and management. The rigour a steering committee expects, without the overhead of a firm.

Additional expertise

A collective on demand

When a project goes beyond what one consultant can carry, a collective of independent consultants and specialists is assembled for the engagement. Scope and people are agreed with you before the start.

Projects in France and across borders

A cross-border project adds interfaces of its own: regulations, teams, suppliers. A DOPEX Conseil assignment covers moving the activities of two sites, in France and Austria, into a new-build plant in France.

DOPEX Conseil works in France, in Europe and in Africa, in French and English.

Working in Europe and in Africa

Frequently asked questions

Industrial projects FAQ

Do you work on projects spanning several countries?

Yes. DOPEX Conseil leads the technical side of moving the activities of two sites, in France and Austria, into a new-build plant in France. The firm works in France, in Europe and in Africa, in French and English.

How are budget, schedule and risks tracked?

The master schedule links studies, permits, packages, machinery and start-up; the budget is tracked package by package against the initial estimates; every risk has an owner and a mitigation plan. Regular steering routines keep these tools up to date: weekly and bi-monthly on the two-site transfer.

At what stage of a transfer project should you be brought in?

Ideally at the scoping stage: that is where the continuity requirements, the scope and what will count as a result are set. Choices made during studies and tenders then lock in the schedule and the costs. The support can cover the whole project, through to start-up and ramp-up.

Get in touch

Site transfer, new plant, CAPEX project: let's talk it through.

Your next project should produce more than a report. One conversation is enough to frame the need, the scope and the right format.